🏠 Temporary Exposure During Loft Conversions or Roof Re-tiling— What the Party Wall Act Really Covers
  Author: Lee Kyson MSc FCIArb MCIOB AssocRICS - opinion only not legal advice!
  Lee Kyson Building Consultancy Ltd
  
  🔍 Introduction
  
    When carrying out a loft conversion or re-tiling a roof, it’s common for a section of the roof to be stripped back, temporarily exposing the top of the party wall. 
    Many adjoining owners (and some surveyors) assume this automatically triggers the Party Wall etc. Act 1996, giving surveyors powers to demand
    “temporary weathering details” or “protection measures.”  
    That assumption is wrong.  
  
  
    The Act only applies where specific works are carried out to the party wall or structure itself, or where a wall is intentionally 
    exposed or enclosed upon as part of the scheme.  
    Temporary exposure during retiling, dormer formation, or beam installation is incidental — it does not in itself invoke the Act and does not 
    give surveyors control over how the contractor manages weatherproofing.  
    This note explains the distinction clearly.
  
  
  ⚖️ 1️⃣ The Core Statutory Framework
  The Party Wall etc. Act 1996 governs specific categories of work:
  
    - Section 1 – new walls at or astride the line of junction
- Section 2 – works to an existing party wall or structure
- Section 6 – excavations within defined proximity and depth
Unless a proposed operation falls within one of those defined categories, the Act does not apply. Routine roofing or retiling works are therefore generally outside the scope of the Act.
  
  🧱 2️⃣ Retiling, Flashings, and Section 2(2)(f), (k), (n)
  Roof works frequently raise questions about whether temporary exposure or reconnection above a party wall engages the Act. The relevant subsections often cited are (f), (k), and (n):
  
    | Subsection | Right Conferred | Application to Roof Works | 
|---|
    
      | s.2(2)(f) | To cut into a party wall for any purpose (e.g. to insert flashings) | ✅ Notifiable where flashings are physically chased or inserted into the wall | 
    
      | s.2(2)(k) | To execute any other necessary works incidental to the connection of a party structure with the adjoining premises | ❌ Not applicable to mere disconnection/reconnection of roof coverings; “connection” refers to structural integration, not weatherproof interfaces | 
    
      | s.2(2)(n) | To expose a party wall or structure hitherto enclosed, subject to adequate weathering | ✅ Only applies where the exposure is permanent or intentional (e.g. removal of roof leaving wall exposed), not temporary construction exposure | 
  
  Hence, stripping tiles, rebedding flashings, or reconnecting adjoining roof coverings does not itself invoke the Act. Only where the wall is intentionally exposed or enclosed upon does s.2(2)(n) arise.
  
  🏗️ 3️⃣ Temporary vs Permanent Exposure
  Understanding whether exposure is incidental or intentional is critical.
  
    | Scenario | Section | Notifiable? | Explanation | 
|---|
    | Temporary exposure during retiling or dormer construction | – | ❌ | Exposure is incidental to other works and re-enclosed shortly afterwards | 
    | Permanent removal of roof leaving wall exposed | s.2(2)(n) | ✅ | Wall previously enclosed, now intentionally exposed; must provide weathering | 
    | Raising or rebuilding parapet after roof removal | s.2(2)(a),(b),(f),(n) | ✅ | Direct alteration to the shared structure | 
    | Adding dormer cheek enclosing on the party wall | s.2(2)(n) | ✅ | Physical enclosure upon the wall | 
  
  Temporary removal of roof coverings during a loft conversion therefore does not trigger s.2(2)(n) unless the exposure is permanent or forms part of the design intent.
  
  📜 4️⃣ Surveyors’ Jurisdiction During Loft Conversions
  Surveyors’ powers are strictly limited to the matters falling within their statutory remit. Temporary exposure occurring during the execution of lawful and notifiable works (for example, inserting beams under s.2(2)(f)) does not confer jurisdiction to control the construction methodology.
  Accordingly, surveyors may:
  
    - Determine rights to undertake the notifiable works themselves;
- Record the condition of the adjoining premises before works commence;
- Provide for compensation or making good under s.11(8) if damage arises.
Surveyors may not:
  
    - Demand “method statements” or “temporary weathering proposals”;
- Require information on scaffolding, tarpaulins, or sequencing;
- Impose or approve health and safety measures.
Those matters fall under common law, the Construction (Design and Management) Regulations 2015, and site management obligations—not under the Party Wall Act.
  
  ✅ 5️⃣ Summary Table
  
    | Issue | Notifiable? | Surveyors’ Jurisdiction? | Comment | 
|---|
    | Temporary exposure during loft conversion | ❌ | ❌ | Incidental exposure; not a “right to expose” under s.2(2)(n) | 
    | Permanent exposure following demolition/removal | ✅ | ✅ | Wall left uncovered; adequate weathering required | 
    | Request for temporary protection measures | ❌ | ❌ | Outside Act; construction methodology issue | 
    | Provision for damage or compensation | ✅ | ✅ | Within s.7(2) and s.11(8) | 
  
  
  ⚖️ 6️⃣ Conclusion
  
    Temporary exposure of a party wall during a loft conversion does not of itself engage the Party Wall etc. Act 1996.
    Surveyors who seek to control temporary weathering or request detailed protection measures exceed their jurisdiction.
    Their role is confined to determining the rights to carry out notifiable works, recording condition, and addressing damage or compensation.
    Only where the works intentionally expose or enclose upon the party wall does s.2(2)(n) apply.
  
  
  Prepared by Lee Kyson MSc Construction Law & Dispute Resolution, FCIArb, MCIOB, AssocRICS